Chartering operations technique
Stages of a chartering deal
The chartering process passes through seven consecutive stages — from the offer to the final settlement.
- Offer — the shipowner or broker offers a vessel: its characteristics (type, tonnage, speed, deadweight), the route (ports of loading/discharge) and the freight rate.
- Negotiations — the charterer clarifies the terms: price, laytime, demurrage, despatch; rates may be adjusted and special conditions discussed.
- Recap / Confirmation — written confirmation of the main terms, exchange of recaps between brokers, agreement of the details and the final consent of the parties.
- Charter Party Execution — signing of the contract, use of standard terms (GENCON, NYPE, etc.), calculation of freight and advances, determination of the date the vessel is ready.
- Mobilization — the vessel proceeds to the port of loading, cargo is prepared, documents are completed, port services are notified.
- Operations — loading and discharging of the cargo, laytime control, issuance of bills of lading.
- Settlement — invoicing, assessment of demurrage/despatch, final freight calculation, payments by all parties.
Typical stages of chartering correspondence
Stage 1: Offer
FROM: [Shipowner / Broker]
TO: [Charterer / Charterer's Broker]
OFFERING FOR PROMPT FIXTURE:
Vessel Name: MV EXAMPLE
Type: General Cargo / Container / Tanker
Class: [Classification Society]
DWT: [Deadweight Tonnage]
Bale Capacity: [cubic metres]
Speed: [knots]
Built: [year of build]
Flag: [flag]
TRADING: [trading area]
LOAD PORT(S): [ports of loading with dates]
DISCHARGE PORT(S): [ports of discharge]
FREIGHT: $[amount] per metric ton / per container / Lumpsum
PAYABLE: [method of payment]
LAYTIME: [days allowed for operations]
DEMURRAGE: $[amount] per day per port
DISPATCH: [% of freight for saving laytime]
CAN LOAD: [date the vessel is ready]
EARLIEST: [date of readiness]
GENERAL CONDITIONS: [GENCON / BALTIME / NYPE / etc.]
Validity: [period of validity of the offer, usually 24–48 hours]
Stage 2: Recap
RECAP — CONFIRMATION OF FIXTURE
FROM: [Charterer's Broker]
TO: [Shipowner's Broker]
REF: [offer number]
DATE: [recap date]
FIXTURE DETAILS:
VESSEL: MV EXAMPLE (as above)
CARGO: [description of cargo]
Quantity: [quantity in metric tonnes]
Package: [packaging]
LOAD PORT(S): [ports and dates]
DISCHARGE: [ports]
FREIGHT: $[amount] all-in [method of calculation]
PAYMENT TERMS: Bill of Lading terms / Prepaid / 1/2 on B/L, 1/2 on delivery
LAYTIME PROVISIONS:
- Laytime: [number of days]
- Time begins: [from what moment]
- Time stops: [when it stops]
- Demurrage: $[amount] per day per port or pro-rata
- Dispatch money: [% for saving]
GENERAL CONDITIONS: [standard conditions]
SPECIAL CLAUSES:
- [any additional conditions]
BOOKING REFERENCE: [booking reference]
OWNER'S CONFIRMATION: [date of the shipowner's confirmation]
CHARTERER'S CONFIRMATION: [date of the charterer's confirmation]
BROKERS: [brokers of the parties]
Stage 3: Recap Correction
RECAP CORRECTION / RELETTERING
TO AMEND RECAP DTD [date of the original recap]
PLEASE NOTE THE FOLLOWING AMENDMENTS:
ITEM 1: [what it was] SHOULD READ [how it should be]
ITEM 2: [what it was] SHOULD READ [how it should be]
ALL OTHER TERMS AS IN RECAP DATED [date]
PLEASE CONFIRM YOUR ACCEPTANCE OF ABOVE AMENDED TERMS
Key parameters of a chartering deal
Freight Rate
| Type of rate | Description | Example |
| Ad valorem | % of the value of the cargo | 5% of the cargo value |
| Per metric ton | For each tonne of cargo | $50/MT |
| Per ton | Per tonne of the vessel's capacity | $100/ton of the vessel |
| Lumpsum | A fixed sum per voyage regardless of the cargo | $500,000 per voyage |
| Per TEU/FEU | Per container unit | $2,000 per TEU |
| Sliding scale | The more cargo, the lower the rate | Volume discount |
| Per diem | Hire rate per day (time charter) | $50,000 per day |
Laytime
| Kind of days | Definition |
| Running days | Calendar days (consecutive). |
| Working days | Working days, excluding weekends. |
| Weather-working days | Excluding days of bad weather. |
| Excepted days | Excluded days: holidays, strikes. |
Examples of formulations:
- "10 running days" — 10 calendar days.
- "7 working days, Sundays and holidays excepted" — working days only.
- "Weather working days" — days of bad weather are excluded.
- "Laytime shall commence when vessel is ready, berth or no berth" — the days begin from the readiness of the vessel, even if there is no berth.
- "Laytime shall commence upon receipt of notice of readiness (NOR)" — the days begin from the moment the notice of readiness is received.
Demurrage and Despatch
Laytime is included in the cost of freight. Exceeding the limit entails demurrage, and early completion entails despatch (a bonus for saving time, usually 50% of the demurrage rate).
FORMULAS:
DEMURRAGE = Number of excess days × Daily demurrage rate
DISPATCH = Number of days saved × 50% × Demurrage rate
EXAMPLE (overrun):
- Laytime: 10 days
- Actually worked: 12 days
- Demurrage rate: $5,000/day
- DEMURRAGE = 2 days × $5,000 = $10,000
EXAMPLE (saving):
- Laytime: 10 days
- Actually worked: 8 days
- DISPATCH = 2 days × 50% × $5,000 = $5,000 (saving for the shipowner)
Typical charter-party terms (GENCON 94)
- Parties — the shipowner (Owner) and the charterer (Charterer).
- Vessel — name, type, class, deadweight (DWT), permitted ports.
- Cargo — description and quantity, packaging and marking, prohibited cargoes.
- Freight — amount and unit of calculation, method of payment (Bill of Lading terms, Prepaid), currency of payment.
- Laytime — number of days, kinds of days (running, working, weather-working), start of the count (ready, NOR), excluded days.
- Demurrage & Despatch — the rate for overrun, the percentage of freight for early completion.
- Port charges — who pays (Owner, Charterer, split), the amounts of the charges.
- Insurance — who insures the cargo, the amount of cover (usually 110% of the value).
- General Average — joint participation in the compensation of losses.
- Liability — exclusions from liability, limits of liability.
- Force Majeure — kinds of circumstances and their consequences.
- Dispute and arbitration — choice of law, arbitration (London, New York, etc.).
Examples of recaps with explanations
Example 1. Voyage charter for dry cargo
RECAP CONFIRMATION
DATE: 30 July 2026
REFERENCE: 2026/DC/001
VESSEL: MV NORTHERN STAR
TYPE: General Cargo Ship
DWT: 35,000 MT
FLAG: Panama
CLASS: Lloyd's Register + DNV
FROM: SHIPPER'S BROKER (Exporter)
TO: OWNER'S BROKER (Shipowner)
CARGO DESCRIPTION:
- Steel coils
- Quantity: 32,000 metric tons
- In 40 x 40 ft containers (800 containers total)
- Shipper: ABC Steel Mills, South Korea
LOAD PORT: Busan, South Korea
ETA: 10–15 August 2026
DISCHARGE PORT: Rotterdam, The Netherlands
ETA: 15–20 September 2026 (via Suez Canal)
FREIGHT RATE:
Base Freight: $18.50 per metric ton
Total Freight: 32,000 × $18.50 = $592,000
Currency: USD
PAYMENT TERMS:
- 50% on B/L signing: $296,000
- 50% on arrival: $296,000
- Payment method: Bank transfer
LAYTIME PROVISIONS:
- Loading laytime: 5 running days
- Discharging laytime: 5 running days
- Time commences: Upon notice of readiness (NOR)
- Time ceases: Upon completion of all cargo work
DEMURRAGE:
- $3,500 per day per port
- Pro-rata for part of day
DISPATCH MONEY:
- 50% of demurrage rate for each day saved
- Applicable if operations completed before laytime expires
- Example: 1 day saved = $1,750 dispatch
GENERAL CONDITIONS:
- GENCON 94
- Hague-Visby Rules apply
- All bills of lading to be clean
SPECIAL CLAUSES:
1. Both ports will revert at Owner's/Charterer's option
2. Cargo to be worked 24 hours per day if both parties agree
3. Gears to be used if available at no extra cost to Charterer
4. Owner's agent at load port to be nominated by shippers
5. All stevedoring to be in accordance with local regulations
INSURANCE:
- Charterer to arrange insurance at 110% of cargo value
- B/L to be marked "Freight prepaid"
VALIDITY OF OFFER: 48 hours from this date
OWNER'S BROKER: Nordic Shipping AS
Tel: +47 2223 4444, Email: broker@nordicship.no
CHARTERER'S BROKER: Global Trade Partners
Tel: +82 2 1234 5678, Email: bp@globalpartners.kr
| Item | What it means | Why it matters |
| ETA Busan | The vessel will be ready to load on 10–15 August | The charterer must have the cargo ready by that time |
| Freight $18.50/MT | The standard rate for Korean steel exports | If the cargo does not fit the tonnage, the freight may change |
| 50/50 payment | Half on signing, half on arrival | The shipowner is guaranteed at least half before delivery |
| 5 days laytime | 5 days each for loading and discharge | Demurrage is paid from the 6th day |
| $3,500/day demurrage | $3,500 is paid for each day of overrun | Expensive — the charterer strives to finish on time |
| GENCON 94 | The standard terms of the international association | The parties know their obligations without a detailed description |
| Gears to be used | The ship's cranes are used free of charge | A saving for the charterer (usually $200–300/day) |
Example 2. Tanker time charter
RECAP — TIME CHARTER
DATE: 5 August 2026
REFERENCE: 2026/TC/TANK/042
VESSEL: MT OCEAN PIONEER
Type: Crude Oil Tanker
Capacity: 130,000 metric tons (DWT)
Age: 5 years, Class: ABS + Nippon Kaiji Kyokai
Flag: Liberia
Speed: 14.5 knots loaded, 15 knots ballast
PERIOD: 36 months
EARLIEST DELIVERY: 15 September 2026
PLACE OF DELIVERY: Singapore (Seller's option between Singapore/Rotterdam)
PLACE OF REDELIVERY: Worldwide, normal trading limits
HIRE (DAILY RATE):
Base Rate: $48,000 USD per calendar day
Delivery to 25,000 bbls basis Suez passing = $48,000
- Full period, all risks for Charterer
PAYMENT:
- Monthly in advance on a fixed date
- Account payable: [Bank details]
- Currency: USD
CREW COSTS:
- Owner pays all crew costs
- Charterer reimburses Owner monthly for crew changes
- Estimated: $800/month per crew member
FUEL/BUNKERS:
- Charterer to pay all fuel and bunker costs
- Owner to provide clean ship; Charterer to settle all bunkering invoices
- Bunker sampling at load port and discharge port
MAINTENANCE:
- Owner responsible for hull and machinery maintenance
- Charterer responsible for cargo-related maintenance
- Vessel in "good and efficient" condition
INSURANCE:
- Owner to maintain P&I insurance (Protection & Indemnity)
- Charterer to arrange cargo insurance
- Owner's All Risks coverage at Charterer's expense
REDELIVERY:
- Vessel to be redelivered "in same good condition as delivered"
- With fuel (if time permits, seller to top off bunkers)
- Normal wear and tear excepted
OFF-HIRE CLAUSE:
- $900/day deduction from hire for each day of breakdown exceeding 24 hours
- Examples of off-hire events:
* Machinery breakdown
* Hull repairs
* Defects affecting cargo operations
GENERAL CONDITIONS:
- SHELLTIME 4 (Tanker Time Charter Uniform Conditions)
- BIMCO Standard Form
- Hague-Visby Rules
SPECIAL PROVISIONS:
1. Charterer has options to extend for additional 12, 24, or 36 months
2. Early redelivery possible with 90 days' notice
3. Vessel capable of all ports worldwide except those restricted by draft
4. Charterer has right to substitute similar vessel with Owner's approval
5. War risk insurance to be arranged at Charterer's cost if required
PERFORMANCE BONDS:
- Charterer to provide performance bond = 3 months hire
- Amount: $144,000 (3 × $48,000)
DISPUTES:
- London Arbitration
- Two arbitrators + umpire
- LCIA Rules apply
VALIDITY: 48 hours from this date
Owner's Broker: Tanker Solutions Inc.
Tel: +1 212 555 0123
Charterer's Broker: Global Energy Logistics
Tel: +44 20 7123 4567
| Item | What it means | Why it matters |
| 36 months | The vessel is chartered for 3 years | A long-term commitment, stable income for the shipowner |
| $48,000/day | Payment of $48,000 every day for 3 years | Total: 48,000 × 365 × 3 ≈ $52.6m for the period |
| Delivery Singapore | The vessel is delivered in Singapore (or Rotterdam) | The charterer starts paying from that moment |
| Owner pays crew | The shipowner pays the crew's wages | The charterer reimburses the costs on crew changes |
| Charterer pays fuel | The charterer pays for fuel | The shipowner saves on consumables |
| Off-hire clause | $900 is deducted for each day of breakdown over 24 hours | Motivates keeping the vessel in good condition |
| Performance bond | The charterer deposits a $144,000 guarantee | Insurance for the shipowner against non-payment |
| SHELLTIME 4 | The standard terms of Shell tanker charters | The parties know their rights and obligations precisely |
Example 3. Container voyage charter
RECAP — CONTAINER VOYAGE CHARTER
DATE: 12 August 2026
REFERENCE: 2026/CONT/SH/089
VESSEL: CONTAINER STAR EXPRESS
Type: Container Ship (Cellular)
Capacity: 5,400 TEU (20-foot equivalent units)
Speed: 23 knots
Gear: Gearless vessel
Flag: Hong Kong
TRADING:
Route: Asia — Europe
Load Port: Shanghai, China
Discharge Port: Rotterdam, The Netherlands
LOADING: CW 36-37, 2026 (Week 36-37 of 2026)
ETA Load: 2–8 September 2026
ETA Discharge: 2–8 October 2026 (via Suez)
FREIGHT RATE:
Base: $1,200 per TEU for full containers
Empty Container Cost: $200 per TEU (if repositioning required)
Reefer Surcharge: +15% (for refrigerated containers)
Total Estimated Freight:
- 4,000 Loaded TEU × $1,200 = $4,800,000
- 400 Empty TEU × $200 = $80,000
- 200 Reefer TEU (within the loaded) × 15% × $1,200 = $36,000
TOTAL: ~$4,916,000
PAYMENT TERMS:
- Payment due within 10 days of B/L date
- Advance: 25% before loading starts = $1,229,000
- Balance: 75% within 10 days of B/L = $3,687,000
LAYTIME:
- Loading: 5 days (included in freight)
- Discharging: 5 days (included in freight)
- Free time includes ship-to-shore (STS) cranes
- Additional days: $8,500 per day per port
DEMURRAGE:
- Port demurrage: $8,500 per day
- Container demurrage (after discharge):
* 20-ft: $5 per day
* 40-ft: $8 per day
- Free time: 7 days after discharge
DISPATCH BONUS:
- 50% of daily detention rate if loading/discharging completed early
GENERAL CONDITIONS:
- CONTINOLOAD terms (Container Voyage Charter Standard)
- Hague-Visby Rules
- Bills of Lading to be clean
WEIGHT LIMITATIONS:
- Maximum container weight: 30 MT per container
- Overweight surcharge: $200 per MT in excess of 20 MT
- Dangerous goods: IMDG Code compliance mandatory
SPECIAL CLAUSES:
1. Containers must be inspected and weighed at load port
2. Shipper responsible for accurate weight declaration
3. Heavy containers to be declared 14 days before loading
4. Reefer containers: Owner to provide power connection and monitoring
5. SOC (Shipper Owned Container) allowed: $75 per TEU additional fee
6. Vessel to call at Suez Canal pilots' station (on-hire)
CARGO INSURANCE:
- Shipper to arrange insurance at 110% CIF value
- B/L must state "Freight prepaid" or "Freight to pay" as per agreement
DOCUMENTATION:
- Shipper to provide shipping instructions 7 days before loading
- Container number, seal numbers, weights must be accurate
- Shipper liable for errors in documentation
STRIKES/FORCE MAJEURE:
- Strikes and lockouts: time on demurrage + hire continues
- War: time suspended, no demurrage/hire accrual
- Deviation: not payable unless forced by circumstances
REDELIVERY/RETURN:
- Empty containers must be returned within free time (7 days)
- Storage charge: $10 per container per day after free time
- Damaged containers: repaired at Owner's expense or charged to charterer
COMPLAINTS:
- Load port: must be filed within 72 hours of operations
- Discharge port: must be filed within 48 hours of discharge
- Later claims not accepted
VALIDITY: 36 hours from this date, then null and void unless extended
Owner's Broker: Coastal Shipping & Logistics
Tel: +852 2299 1234
Charterer's Broker: Sunrise Forwarding Ltd.
Tel: +8610 5555 6666
| Item | What it means | Why it matters |
| 5,400 TEU | The vessel carries 5,400 twenty-foot containers | Maximum capacity with 20-foot containers |
| $1,200/TEU | The standard Shanghai–Rotterdam rate | Depends on demand, season and capacity |
| 5 days laytime | 5 days each for loading and discharge | Container operations are usually faster — 2–3 days |
| Empty container $200 | Payment for the carriage of empty containers | Typical for routes with a cargo flow imbalance |
| Reefer surcharge +15% | Refrigerated containers are more expensive | Payment for higher energy consumption |
| $8,500/day additional | For additional days beyond 5 days laytime | Motivates fast port work |
| Weight limitations 30 MT | Maximum 30 tonnes per container | Protection against overloading, stability of the vessel |
| SOC containers $75 | The shipper's container instead of the vessel's | Permitted for an additional fee |
| Complaints 72/48 hours | Claims are filed within tight time limits | Otherwise the cargo is considered delivered in proper condition |
| Validity 36 hours | The offer is valid for 36 hours | A fast-moving market requires promptness |
Real example: a Contract of Affreightment (Gencon 94)
Below is a real example of a voyage charter party under the GENCON 94 form for the carriage of a consignment of steel by several bulk carriers. This is a classic Contract of Affreightment (COA) — a contract for a series of scheduled shipments, where several vessels and several lots of cargo fall under a single charter.
Part I — the completed "header" of the deal
RECOMMENDED UNIVERSAL CHARTER PARTY OF THE BALTIC AND INTERNATIONAL
MARITIME COUNCIL (REVISED IN 1922, 1976 AND 1994)
CODE NAME: "GENCON"
Place and date: Moscow, 24.05.2026
Owners: Shipping Ltd., Edinburgh, United Kingdom
Charterers: First class
Name of vessel / Gross-Net tonnage:
m/v "BALTIC SKY" or substitute — 2061/1178
m/v "SONATA" or substitute — 5184/3046
Total deadweight on summer load line (about):
3,085 t — m/v "BALTIC SKY"
7,909 t — m/v "SONATA"
Present position: in the course of a voyage
Expected readiness to load: see boxes 21 and 22
Port or place of loading / discharge:
1 SP Rotterdam or Dunkirk → 1 SP Vyborg or St. Petersburg
1 SP Vyborg or St. Petersburg or Ust-Luga → 1 SP Dordrecht
1 SP Vyborg or St. Petersburg or Ust-Luga → 1 SP Rotterdam
Cargo: about 150,000 t of steel in total, stowage by weight,
in lots of 2,800 – 6,000 t each, jointly agreed
Freight rate (FIOS L/S/D terms):
Euro 12/t — Rotterdam
Euro 13/t — Dunkirk
Euro 36/t — Rotterdam
Euro 25/t — Rotterdam
Payment of freight: 100% within 10 banking days of the date of signing
and release of the bill of lading, to the owners' account (see box 23)
Loading/discharging gear: see box 24
Laytime for loading:
1,500 t WWD SHINC
Laytime for discharging:
1,500 t WWD SSHEX UU
Shippers: to be nominated on the charterers' instruction
Agents (loading/discharge): see box 34
Demurrage rate (per day, pro rata):
Euro 3,000 — m/v "Baltic Sky"
Euro 6,000 — m/v "Sonata" (see also box 26)
Cancelling date: see boxes 21 and 22
General average to be adjusted in: London
Tax on freight: for the charterers' account
Brokerage commission: no commission
Law and arbitration: London (see clause 19)
It is mutually agreed that this contract shall be performed subject to the
conditions of the charter party, which includes both Part I and Part II. In
the event of a conflict, the provisions of Part I prevail over those of Part II.
Part II — key terms of GENCON 94
The full standard terms of "Gencon 94" (Part II) include 19 clauses. The key ones are:
| Clause | Essence |
| 1. Presentation of the vessel | The vessel shall proceed to the port of loading after completing its previous obligations, load and deliver the cargo to the port of discharge. |
| 2. Owners' liability | Liability only in the absence of due diligence in making the vessel seaworthy; a list of exceptions (nautical fault, etc.). |
| 3. Deviation | The vessel may call at any ports, tow, and deviate to save life and property. |
| 4. Payment of freight | Freight is paid on the loaded quantity; prepaid freight is deemed earned and non-returnable, even if the vessel/cargo is lost. |
| 5. Loading/discharging | The cargo is worked by the charterers free of the risk and expense of the owners (corresponds to FIOS); the provision of the vessel's cargo gear. |
| 6. Laytime | Laytime runs from 13:00/14:00 if the notice is given before 12:00, otherwise from 06:00/08:00 the following working day; shifting to the berth and customs formalities are not counted as laytime. |
| 7. Demurrage | Paid per day or pro rata; on non-payment — a 96-hour notice, then the right to cancel the charter. |
| 8. Lien | The owners have a lien on the cargo and sub-freight as security for freight, dead freight, demurrage and losses. |
| 9. Cancelling | If the vessel is not ready by the cancelling date, the charterer may cancel the charter; the owners must give notice of the delay and offer a new date. |
| 10. Bills of lading | Signed in the "Congenbill 1994" form with the note "Without prejudice to this charter party". |
| 12. General average | Adjusted in London under the York-Antwerp Rules 1994. |
| 15. Brokerage commission | Charged on earned freight, dead freight and demurrage; on non-performance — 1/3 of the commission in favour of the brokers. |
| 16. General strike clause | The rights of the parties in strikes/lockouts affecting loading or discharge. |
| 17. War risks ("Voywar 1993") | The owners' right to cancel the contract or deviate from the route in the event of war risks (war, mines, piracy, terrorism, blockade). |
| 18. General ice clause | The master's right to leave the port in case of ice danger; the charterer's rights when the port of discharge is inaccessible. |
| 19. Law and arbitration | Subject to English law, arbitration in London (or another option — New York / an agreed place). |
What is important in this example: this is a COA (Contract of Affreightment) — a contract for a series of shipments of steel (~150,000 t) by several substitute vessels ("Baltic Sky", "Sonata") with flexible ports of loading/discharge and separate freight rates by direction. The FIOS L/S/D terms mean that loading/discharging and stowage are performed at the charterer's expense and risk — typical for bulk cargo. Laytime is set at a rate of 1,500 t/day with different counting regimes: for loading — WWD SHINC, for discharge — WWD SSHEX UU.
Peculiarities of correspondence and standard expressions
Phrases in chartering correspondence
| Situation | English expression | Translation |
| On offer | We are offering… | We are offering… |
| For your prompt fixture… | For your prompt fixture… |
| Subject to owner's approval… | Subject to owner's approval… |
| Validity of 48 hours… | Validity of 48 hours… |
| In negotiations | We are a bit high at this level… | This is a bit expensive… |
| Can you reduce the rate? | Can you reduce the rate? |
| We are more at… | We are closer to [an amount]… |
| This is our rock bottom… | This is our rock bottom… |
| Let us come back to you… | We will get back to you… |
| On recap | As per recap dated… | As per recap dated… |
| Please confirm… | Please confirm… |
| We hereby confirm… | We hereby confirm… |
| Subject to | Subject to… |
| All other terms as previously agreed | All other terms as previously agreed |
| On reference to conditions | Under the General Conditions… | Under the General Conditions… |
| According to the Charter Party… | According to the Charter Party… |
| As per Clause… | As per Clause… |
Typical sequence of correspondence
DAY 1, 09:00 — OFFER from the shipowner
From: Owner's Broker
To: Charterer's Broker
Subject: OFFERING MV EXAMPLE
Dear Sirs,
We are offering for your prompt fixture:
VESSEL: MV EXAMPLE
DWT: 35,000 MT
CAN LOAD: 15–20 August
LOAD: Shanghai
DISCHARGE: Rotterdam
FREIGHT: $18.50/MT
LAYTIME: 5 running days each port
DEMURRAGE: $3,500 per day
DISPATCH: 50%
GENERAL CONDITIONS: GENCON 94
Please advise your interest.
Best regards,
Owner's Broker
────────────────────────────────
DAY 1, 10:30 — CLARIFYING QUESTION
From: Charterer's Broker
To: Owner's Broker
Subject: RE: OFFERING MV EXAMPLE
Thanks for the offer.
We are interested but have some questions:
1. What's the earliest you can adjust your freight level?
2. Can you accept 7 days laying days?
3. Who pays stevedoring?
Please advise.
────────────────────────────────
DAY 1, 11:45 — REPLY TO QUESTIONS
From: Owner's Broker
To: Charterer's Broker
Subject: RE: RE: OFFERING MV EXAMPLE
Regarding your questions:
1. Freight: We can consider $18.00/MT but no further reduction.
2. Laytime: 5 days is our limit as per other commitments.
3. Stevedoring: All in cost, included in freight.
Please confirm if acceptable.
────────────────────────────────
DAY 1, 14:00 — CONSENT
From: Charterer's Broker
To: Owner's Broker
Subject: RECAP — MV EXAMPLE FIXED
We confirm fixture on the following terms:
VESSEL: MV EXAMPLE
LOAD: Shanghai, CW 33-34, 2026
DISCHARGE: Rotterdam
CARGO: 32,000 MT steel coils
FREIGHT: $18.00/MT = $576,000
PAYMENT: 50% on B/L, 50% on arrival
LAYTIME: 5 running days loading, 5 running days discharging
DEMURRAGE: $3,500 per day
DISPATCH: 50%
GENERAL CONDITIONS: GENCON 94
Please confirm your acceptance.
────────────────────────────────
DAY 1, 15:30 — CONFIRMATION OF THE RECAP
From: Owner's Broker
To: Charterer's Broker
Subject: RECAP CONFIRMATION
We confirm your recap dated 01 August 2026 with reference MV EXAMPLE.
All terms as per your recap accepted.
Fixture confirmed.
────────────────────────────────
DAY 2, 09:00 — SIGNING OF THE CHARTER PARTY
[Both parties receive the signed document]
Practical advice for a chartering specialist
What to do
- Be prompt — the freight market moves fast.
- State the terms clearly — avoid ambiguity.
- Check the documents — bills of lading, invoices, recaps.
- Know the market — follow quotations, rates and demand.
- Communicate through brokers — they are professionals in negotiation.
- Document everything — confirm the terms in writing.
- Meet the deadlines — especially laytime and payments.
- Check the deadweight — do not exceed the vessel's DWT.
What not to do
- Do not make promises without approval — first agree with management.
- Do not ignore special conditions — they are important.
- Do not be late with payments — it damages your reputation.
- Do not sign a charter party without reading it carefully.
- Do not neglect insurance — it costs dear.
- Do not forget about laytime — it is money.
- Do not economise on documentation — you will save on problems.
Freight calculation: examples
Example 1. Voyage charter
GIVEN:
- Vessel: General Cargo, 35,000 MT DWT
- Freight rate: $50/MT
- Cargo: Steel products, 28,000 MT
- Laytime: 5 days at 1,000 MT/day = 28 days
- Actual work: 35 days
- Demurrage: $3,500/day
CALCULATION:
1. Base freight = 28,000 MT × $50 = $1,400,000
2. Demurrage:
- Excess days: 35 − 28 = 7 days
- Demurrage = 7 × $3,500 = $24,500
3. Final freight:
Total = $1,400,000 + $24,500 = $1,424,500
PAYMENT TERMS:
- 50% = $712,250 (on signing B/L)
- 50% = $712,250 (on arrival at the port)
Example 2. Time charter
GIVEN:
- Vessel: Tanker, 130,000 MT
- Daily rate: $48,000/day
- Period: 6 months ≈ 180 days
- Delivery: 1 September 2026
- Redelivery: 28 February 2027
- Off-hire events: 8 days of breakdown
CALCULATION:
1. Base hire:
- Number of days: 1 September — 28 February = 180 days
- Daily rate: $48,000
- Base hire = 180 × $48,000 = $8,640,000
2. Off-hire (deductible):
- Days without payment: 8 days × $48,000 = $384,000
3. Final hire:
Total = $8,640,000 − $384,000 = $8,256,000
PAYMENT TERMS:
- Monthly in advance: 30 × $48,000 = $1,440,000/month
- For 6 months: 6 × $1,440,000 = $8,640,000
- After deducting off-hire: $8,256,000
Example 3. Container charter
GIVEN:
- Vessel: 5,400 TEU
- Rate: $1,200/TEU
- Cargo: 4,000 full containers (20-ft)
+ 200 reefer containers (within the 4,000)
+ 400 empty containers for repositioning
- Reefer surcharge: +15%
CALCULATION:
1. Standard containers:
- (4,000 − 200 reefer) × $1,200 = 3,800 × $1,200 = $4,560,000
2. Reefer containers:
- 200 × $1,200 × 1.15 = 200 × $1,380 = $276,000
3. Empty containers:
- 400 × $200 = $80,000
4. Final freight:
Total = $4,560,000 + $276,000 + $80,000 = $4,916,000
PAYMENT TERMS:
- Advance payment (25%): $1,229,000
- Balance (75%): $3,687,000
- Payment within 10 days of B/L